GiggEx Login
Platform / Operations
Operations

Demand vs. plan vs. staffed — every room, every day.

Block schedules tell you who's supposed to be where. Actual coverage rarely matches exactly — GiggEx makes the gap visible the day it happens, not the month after in a close.

01

Day-specific plan, not flat averages

Block grids run on irregular cycles — a 5th Tuesday can differ from every other Tuesday in the month. GiggEx models the actual grid, not a weekday/weekend flat split.

02

Room utilization, tracked daily

Which rooms ran, which sat open, and which were double-covered — laid against the schedule so utilization is a daily fact, not a quarterly guess.

03

Staffing vs. grid, at a glance

Distinct providers per day compared against the grid's required headcount — over-staffed and under-staffed days both surface immediately.

04

Built for real schedule sources

Point it at your existing scheduling exports — no rip-and-replace of the system your team already runs day to day.

A room sitting open on the schedule and a room quietly double-covered are both invisible in a monthly report. Neither is invisible here.
How it looks day to day

Grid, actuals, and the gap between them

Room-by-room coverage

Illustrative week, not real facility data
Room Mon Tue Wed Thu Fri OR 1 OR 2 OR 3 Staffed to plan Variance — flagged Room open / not scheduled
Talk to us Back to Platform
← Platform overview Next: People →
© GIGGEX